Benchmark the Process or Product
Determine the Area to Benchmark
Identify Benchmarking Candidates
Prepare for the Visit
Draw Conclusions
Establish Causal Relationships Using Data
Nominal X and Continuous Y
- t test - one sample
- t test - two sample
- t test - paired
- One-way ANOVA and F test
- Test for differences in variances
- Nonparametric tests (optional)
- N way ANOVA
Continuous X and Continuous Y
- Simple Linear Regression
- Correlation
- Multiple Regression
- ANCOVA
Nominal X and Nominal Y
- Test probabilities
- Contingency analysis
Continuous X and Nominal Y
Summarize the factors that are related to the root cause of the problem
Summarize the mechanism of how the factors influence the response
Analyze the Process Map
Theory of constraints
Lean thinking
Continuous flow
Non-value-added activities
Cycle time reduction
Review the process flow and associated data
Highlight the relationship of the project problem and the process map
Summarize how the current process map is related to the root cause of the
problem
Visualize the Problem
Review all visual data
Summarize how the visual data is related to the root cause of the problem
Determine Root Cause
Develop a Cause & Effect Diagram
Determine the 5 Whys
List and prioritize all root cause summary findings
Identify the ease of control and percent contribution to the root cause
Validate the root cause
Link Process Simulation Data to JMP for Analysis
Moving data to JMP from iGrafx
Generating custom reports in iGrafx